Induction plate Whirlpool

324,4 € (вкл. НДС)
Ежемесячный платеж от 12.74€
Доставка 1-3 раб. дня
Артикул:
WBS2560NE
Бренд:
9.4 кг
Сравнить0
Описание
4 induction rings. intuitive slider, for effortless control of
your appliance settings. This Whirlpool induction glassceramic Hob features: An elegant technology, that heats the
pan, not the hob, reducing energy dispersion and providing
perfect cooking results. Electric power supply.

Melting 

Perfect low-heat cooking. The Melting function allows
you to cook at very low temperatures, providing you with
the ideal solution for melting chocolate, butter or for
cooking light, delicate sauces. 

Keep warm 

Warm meals, anytime. The low-powered Keep Warm
function prevents your food from cooling, whilst the rest
of the meal is being prepared. 

Simmering 

Superb simmering. The Simmering function allows you to
obtain the perfect results for your slow-cooking recipes,
and prevents your food from toughening.

Power management 

Outstanding energy efficiency. With the Power
Management function, you set the hob's power level, to
avoid the risk of overloading the power supply in your
home.

ПодробнееShow less
Подробнее о товаре
WBS2560NE

Характеристики

Power management
+
Цвет
Чёрный
Таймер
+
Дизайн
Filo
Блокировка от детей
+
Total power, W
7200
Power levels
18
The number of heating zones
4
Frameless
+
Hob width, cm
60
Hob width, mm
590
Hob depth, mm
510
Built-in width, mm
560
Built-in depth, mm
480
Hob height, mm
54
Flush-mounted
+
Controls
Slide control
Flex zone
1
Quick selections
3
Built-in height, mm
50
Отзывы
Комментариев нет

Оставить отзыв

  • Качество:
  • Соответствие:
Опишите этот продукт используя простые и короткие слова.
Загрузить изображения:
Бросьте изображения сюда, или кликните для загрузки.
Оформление заказа
Похожие товары

Поиск

Меню

Logi sisse / Registreeru
+372 5811 9797
info@alfashop.ee
 Tallinn, Paavli 5/1
Informatsioon

Создайте учётную запись для сохранения любимых товаров.

Войти